10.10(1) Permit expenses. The pipeline company shall pay the actual unrecovered cost incurred by the commission attributable to the informational meeting, processing, investigation, hearing, and inspection related to a petition requesting a pipeline permit or any other activity of the commission related to a pipeline permit.
10.10(2) Construction inspection. The pipeline company shall reimburse the commission for the actual unrecovered expenses incurred due to inspection of pipeline construction or testing activities following from the granting of a pipeline permit.
[ARC 4957C, IAB 2/26/20, effective 4/1/20; Editorial change: IAC Supplement 7/24/24]