101.04: Notice of Proposed Construction

 

At least 48 hours prior to the start of construction of pipeline installations, notice shall be filed with the Department in accordance with the requirements listed in 220 CMR 101.04(1) through (3):

(1) Pipeline installation projects of 5000 feet or more in length: All such projects.

(2) Pipeline installation projects of 2500 feet to 5000 feet in length: 25% of such projects, or a maximum of three of the projects in a calendar year.

(3) If no pipeline installation projects in a calendar year meet the requirements of 220 CMR 101.04(1) and (2), then there shall be reported to the Department no less than three pipeline installations irrespective of the length, provided this number or more are undertaken.

 