111.03: General Provisions

 

Unless otherwise ordered by the Department in any particular case, no street, place or way subject to the provisions of 220 CMR 111.00 shall be constructed over a high-pressure gas main except where it is necessary for said street, place or way to cross said main.  Whenever such crossings are required, they shall be made as nearly  as practicable to  an angle of 90°  to the center  line of  said main.  The main shall be enclosed in a casing and constructed in a manner which meets the requirements of the specifications issued by the American Petroleum Institute - API  RP  1102  (7th  ed.), Steel Pipelines Crossing Railroads and Highways, except that the minimum distance from the top of the casing to the used surface of the road  shall be four feet six inches  and the casing shall extend beyond the edges of the pavement or used surface of the street, place or way where there is  no pavement  a  distance  of not less than 25 feet  or to the line of the right of way for the street, place, or way, whichever is the lesser.

In cases where said right of way is not defined, the casing shall extend 25 feet beyond the edges of the pavement or the used  surface of  the street,  place or way  where  there is no pavement. The Department will ordinarily grant a reduction in depth of cover limitations provided that all such construction be in accordance with the specifications for excavation and backfill set  forth in 220 CMR 111.04, and the Department will also grant a variance from the requirement of casing if the pipeline facility can be adequately safeguarded and such installation is made in accordance with 220 CMR 111.04.

 

Amended by Mass Register Issue 1432, eff. 12/11/2020.