Construction quality assurance plans shall be maintained in writing and shall require that:
(1) Each operator shall inspect any new construction by outside Contractors that is or will be incorporated into the operator’s system to verify that the resulting installation meets operator specifications;
(2) A representative number of field verification audits shall be conducted after field work is completed for specific installation tasks; and
(3) Performance audits shall be conducted to evaluate a representative sample of various tasks during the actual time that the work is being performed by the employee or Contractor
Added by Mass Register Issue 1532, eff. 10/11/2024.