Appendix 7-G. Notification Of Construction

 

NOTIFICATION OF CONSTRUCTION

FOR

GAS GATHERING LINES TO BE SUBJECTED TO PRESSURE OF 125 PSIG OR MORE

OR

FOR GAS GATHERING LINES TO BE LOCATED IN AN AREA USED FOR COMMERCIAL FARM PURPOSES

 

COMPANY _________________________ DATE ______________________________

DESCRIPTION OF PROJECT _______________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

 

LOCATION OF PROJECT (file a copy of the map filed with the Article VII application)

_________________________________________________________________________

_________________________________________________________________________

 

ESTIMATED STARTING DATE _____________________________________________

 

ESTIMATED COMPLETION DATE __________________________________________

 

PERSON TO BE CONTACTED REGARDING PROJECT _________________________

 

ADDRESS ________________________________________________________________

 

_____________________________________ TELEPHONE NO._____________________

 

MAXIMUM ALLOWABLE OPERATING PRESSURE ____________________________

 

LOCATION CLASS* ________________________________________________________

 

PIPE & COATING DESCRIPTION

a. NOMINAL DIAMETER _____________________________

b. NOMINAL WALL THICKNESS _______________________________

c. PIPE SPECIFICATION _______________________________

d. GRADE _________________________________

e. COATING TYPE ________________________________

f. METHOD OF APPLICATION _______________________________

g. LONGITUDINAL JOINT TYPE ________________________________________

 

TEST DATA:

a. TEST MEDIUM ____________________________

b. DURATION _____________________________

c. TEST PRESSURE ______________________________

 

NAMES AND MAILING ADDRESSES OF AFFECTED FARMLAND OPERATORS:

Name

Mailing Address

 

 

 

 

 

 

 

 

 

 

* If the line is to be constructed within 150 feet of an existing structure used for a residence or place of business that portion of the line must be constructed to transmission line standards. Under these circumstances, contact the Albany Office of the Gas Division prior to construction: (518) 474-5453.